Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 2740

Deviations to calculated level found in SUM

$
0
0

Hi,

 

I am applying patches to a ECC6 EHP6 system.

 

In the PREP_EXTENSION/BIND_PATCH phase, the SUM is giving me the following message for the SAP_HR and EA-HR support Packs.

 

For SAP_HR I am updating from the SP 93 to A0 (100) and EA-HR from 55 to 62.

 

I verified the download directory and the required SP files for SAP_HR and EA-HR are in it as you can see below. With that said, I am not sure why the SUM is showing me that status.

 

Any help will be appreciated!

 

SAP_HR SUM:

SAP_HR.PNG

 

EA-HR SUM:

 

es_hr.PNG

 

SAP_HR SP files in download directory:

sap_hr_sp.PNG

 

EA-HR SP files in download directory:

 

ea_hr_sp.PNG

 

Thanks!


Viewing all articles
Browse latest Browse all 2740

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>