Yes ive read it I actually copied it coz i didnt have time lol )) I copied because there is no answer to the problem in that thread.
The job is shown as complete in a couple of seconds its green thought the status of the chain was red. The sigma is still there i cant delete the request.
When i move the cursor over sigma it sayd that roll up is in process.
Will it help if we will shut down the server?